Question on using scheduler to exclude lessons
Results 1 to 5 of 5
  1. #1
    jennysmi's Avatar
    jennysmi is offline Junior Member
    Join Date
    Feb 2011
    Location
    IL
    Posts
    13

    Default Question on using scheduler to exclude lessons

    Hi-
    I made up a yearly schedule thru T4L. I'd like to skip some of these activities and have the scheduler assign other ones. Is there a way to do this? For example, we went over Mesopotamia last year when we weren't using T4L and I'd like to skip ahead in History..is there a way to exclude this lesson and have the program schedule something else?
    Thanks!
    ~Jenny

  2. #2
    hearthstone_academy's Avatar
    hearthstone_academy is offline Administrator
    Join Date
    Nov 2006
    Location
    OR
    Posts
    6,908
    Blog Entries
    18

    Default

    The scheduler is a new resource, with limited abilities so far. Unfortunately, individual activities can't be excluded. You can, however, input start and stop dates, as well as the beginning and ending activity numbers. If I want to exclude a block of activities, I generate one schedule for BEFORE that block, and another for AFTER that block.

    Mom of six . . . current students and homeschool graduates. Enjoying using Time4Learning since 2006!

  3. #3
    jennysmi's Avatar
    jennysmi is offline Junior Member
    Join Date
    Feb 2011
    Location
    IL
    Posts
    13

    Default

    Thanks Kelly-
    I didn't think there was a way to do that but was hoping. I'll try to work with the start/stop dates and see if that works. Maybe we'll just do something not T4L related in History that day.
    Thanks for replying..


    Quote Originally Posted by hearthstone_academy View Post
    The scheduler is a new resource, with limited abilities so far. Unfortunately, individual activities can't be excluded. You can, however, input start and stop dates, as well as the beginning and ending activity numbers. If I want to exclude a block of activities, I generate one schedule for BEFORE that block, and another for AFTER that block.
    ~Jen
    Mom to an 10 year old boy-in our first week of T4L
    "All that is gold does not glitter.."

  4. #4
    pcmama98 is offline Junior Member Newbie
    Join Date
    Aug 2012
    Location
    RI
    Posts
    6

    Default Activity scheduler

    Quote Originally Posted by hearthstone_academy View Post
    The scheduler is a new resource, with limited abilities so far. Unfortunately, individual activities can't be excluded. You can, however, input start and stop dates, as well as the beginning and ending activity numbers. If I want to exclude a block of activities, I generate one schedule for BEFORE that block, and another for AFTER that block.
    I cannot seem to figure out how to use the activity scheduler. The video helped in showing me how to use it, but when I attempt to add a lesson to start with it will not allow me to type it in so I am lost...am I doing something wrong? I know where to find them and how to use them on the site, but how do I choose lessons for printing out a plan etc?..

  5. #5
    wellowlbe is offline Junior Member
    Join Date
    Sep 2012
    Location
    MA
    Posts
    5

    Default

    I believe you use the pulldown menu to select the lesson plan number.


    Quote Originally Posted by pcmama98 View Post
    I cannot seem to figure out how to use the activity scheduler. The video helped in showing me how to use it, but when I attempt to add a lesson to start with it will not allow me to type it in so I am lost...am I doing something wrong? I know where to find them and how to use them on the site, but how do I choose lessons for printing out a plan etc?..

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •